Military & Defense

Boeing hasn't sold a single 737 Max in months, prolonging a drought as the company struggles to return the plane to service

boeing 737 max planes
Grounded Boeing 737 MAX aircraft are seen parked in an aerial photo at Boeing Field in Seattle, Washington, U.S. July 1, 2019. Picture taken July 1, 2019. REUTERS/Lindsey Wasson
Read in app

Boeing has gone four straight months without receiving a single new order for its troubled 737 Max jets.

According to orders and delivery data posted by the planemaker, it received no orders in July, continuing a dry spell as the global grounding of the 737 Max entered its sixth month.

Additionally, the company only delivered 19 planes overall in July 2019, down from 39 in July 2018. Two of those were older 737 models that are still being produced.

Boeing reported 31 total orders for the month, mostly larger wide-body planes, up from 25 orders the in July 2018.

Although British Airways' parent company IAG announced its intent to order 200 of the jet during June's Paris Air Show, the order has not yet been formalized.

The 737 Max has been grounded since March after two fatal crashes of the new model aircraft in about five months.

Read more: Photos show how Boeing's grounded 737 Max planes are piling up at the company's Seattle plant

Preliminary reports into the two crashes — Lion Air Flight 610 and Ethiopian Airlines Flight 302 — indicate that an automated system erroneously engaged and forced the planes' noses to point down due to a problem with the design of the system's software. Pilots were unable to regain control of the aircraft.

The automated system, the Maneuvering Characteristics Augmentation System (MCAS), was designed to compensate for the fact that the 737 Max has larger engines than previous 737 generations. The larger engines could cause the plane's nose to tip upward, leading to a stall — in that situation, MCAS could automatically point the nose downward to negate the effect of the engine size.

The company cut production of the plane by 20% to 42 models a month in April. However, the jets produced since March have not been delivered and have been piling up in storage as Boeing prepares to submit a proposed fix to the FAA.

Read more: 'There was no way that they could've survived': A Boeing 737 Max victim's mom and brother are demanding justice from the FAA

Notably, however, only one airline has cancelled an existing order for the jet. Boeing still has a backlog of about 4,550 unfulfilled orders, signifying a cautious confidence within the airline industry that once the grounding is lifted, the plane will be reliable. Analysts have said they expect orders to resume once the plane is flying again, and Boeing said it could ramp up production to 57 planes a month.

In July, Boeing said it plans to submit its proposed software fix to the FAA in September, and expects it to be approved — and the grounding to be lifted — in early November. Some airlines have expressed concern that the grounding will last into 2020.

Read next

David is a Senior Transportation Reporter for Business Insider. He primarily covers airlines and air travel. A native New Yorker and avid photographer, David previously covered travel, credit-card rewards, and frequent-flyer programs. Before joining Business Insider, David was a freelance writer and editor — before that, he worked in public affairs. He earned his bachelor's degree from Muhlenberg College and his master's from the University of Edinburgh in Scotland, UK. You can follow him on Twitter or Instagram, visit his website, or send him an e-mail at dslotnick@jkmperu.com. Here are some of his recent stories: